Sonshine Park Construction
Click on a picture to enlarge it.
Index page
1
2
6/14/09 - A special swing is designed for handicapped children.
9/7/09 - Work has begun on the backstops for the two baseball fields.
9/13/09 - The ballpark has cyclone fencing installed in the backstop and dugout areas.
Generated by
Galerie
Sunday, September 13, 2009